ASG Renaissance
About Us | Careers | News | Partners | Community Involvement | Contact Us
ASG e-brochure
Search:   
Diversity Supplier Development | Operations Transformation Consulting | STC: Strategic Transformation Consulting | Environmental Consulting | Professional Engineering Services | Grant and Fundraising  



  
Case Study - Evaluating Responsiveness and Flexibility

Situation:
Unable to consistently meet their customer's fluctuating production needs, a supplier looked for assistance with improving material flow and revamping their existing Material Requirements Planning (MRP) system to reduce excessive inventory carrying costs. 

Solution:
ASG developed recommendations to improve the existing MRP system by:

  • Analyzing overall production and materials handling processes
  • Facilitating cross-functional teams to identify opportunities for improved materials flow and better utilize the existing MRP system by eliminating waste

Result:
Supplier was able to improve material flow and eliminate significant amount of waste from the process. Material is now tracked through a "Just-in-Time" process, which reduced inventory expense by $220,000 per year.

 




Copyright 2008 ASG Renaissance. All Rights Reserved. ISO 9001:2000 / Q1 /EOE /MBE / MMBDC CERTIFIED / SMSBF